The most important page on this site

Why you should clean your heating system before a heat pump

The radiators and pipes a heat pump connects to have usually been in service for years. The water inside them often contains sludge, magnetite and debris. The system must be professionally cleaned and flushed before the heat pump is connected, as set out in BS 7593.

Illustration comparing dirty and clean heating system waterLeft: a sample of dirty system water, cloudy with dark particles and settled sludge, above a pipe cross-section partly blocked by deposits. Right: clean, clear system water above an unobstructed pipe cross-section.dirty waterclean water
Illustrative only and not to scale. Sludge and debris can restrict flow through radiators, pipework and the heat pump’s heat exchanger and filters.

What is inside an old heating system?

A wet heating system circulates water through radiators and pipes. Old system water can contain sludge, magnetite and debris. Keeping the radiators does not mean keeping dirty water: discuss professional cleaning before connecting the new heat pump.

Why it matters more with a heat pump

Sludge and debris in an old system can restrict flow through radiators, pipework and the heat pump’s heat exchanger and filters. With any heat source that is unwelcome. With a heat pump it deserves particular care, because heat pumps are designed to run at lower flow temperatures than most gas boilers, for longer periods.

Our heat pump explainer explains lower flow temperatures and how the equipment connects to a wet heating system.

There is also the manufacturer to consider. Always check the heat pump manufacturer’s installation manual and warranty terms for their water-quality requirements. A clean, treated, filtered system is the starting point for meeting them.

What BS 7593 covers

The standard for this work is not new or obscure. It is the British Standard code of practice for heating water:

BS 7593 is the British Standard code of practice for preparing, commissioning and maintaining domestic central heating and cooling water systems. It covers water treatment against scale and corrosion, cleaning and flushing of systems, and the use of in-line filters.
Source: BSI Knowledge, BS 7593(opens in a new tab)

It has been kept up to date, and it is not just for boilers:

The current version is BS 7593:2019+A1:2024. Industry guidance confirms it applies whether a system is powered by a boiler or a heat pump.
Source: ACR Journal on HHIC/HPA guidance(opens in a new tab)

The standard sets out more than one way to clean a system. The right choice depends on the system in front of the installer:

BS 7593 describes three cleaning and flushing methods: powerflushing (external pump and tank), mains pressure cleaning, and gravity cleaning (using the system's own circulating pump).
Source: Registered Gas Engineer summary of BS 7593:2019(opens in a new tab)

Our guide to powerflush, mains and gravity cleaning explains how each of those works and what to ask about them. We do not rank them; the sources we rely on do not, either.

What “professionally cleaned” should mean

“We’ll give it a flush” can mean very different things. For a heat pump retrofit, a professional clean should be a planned, recorded piece of work, not an afterthought. In plain terms you would expect:

  • A recognised method. The installer uses one of the cleaning and flushing methods described in BS 7593 and can tell you which one.
  • Cleaning, then flushing. Loosened sludge and debris are removed from the system, not just stirred up.
  • Treated refill. The system is refilled and protected with an inhibitor, as BS 7593 covers water treatment against scale and corrosion.
  • An in-line filter. A filter is fitted to collect debris that circulates later.
  • A record. The work is written down as part of commissioning so you can see it was done.

Industry commissioning paperwork reflects exactly this. One widely used checklist includes these items:

The Heat Pump Association's air source heat pump commissioning checklist asks the installer to confirm "System Flushed & Cleansed (as BS 7593)", "System purged of air", inhibitor added and an in-line filter fitted.
Source: HPA air source heat pump commissioning checklist(opens in a new tab)

The right order: clean, protect, connect

Ask for cleaning before connection. The picture below illustrates the sequence to discuss with your installer.

  1. STEP 1

    Old system

    Existing radiators and pipework, often holding sludge, magnetite and debris.

  2. STEP 2

    Professional clean

    Cleaned and flushed using a BS 7593 method, then refilled with treated water.

  3. STEP 3

    Filter fitted

    An in-line filter is fitted to catch debris that circulates later.

  4. STEP 4

    Heat pump connected

    Only then is the heat pump connected and commissioned.

The order matters: clean, protect, then connect.

What to ask your installer

A homeowner should ask any installer:

  1. How will the existing system be cleaned before the heat pump is connected?
  2. Which BS 7593 method will you use, and why is it suitable for my system?
  3. Will an in-line filter be fitted, and how should it be maintained?
  4. What inhibitor will be added, and will that be recorded?
  5. Can I have a copy of the commissioning record at handover?

You will find these questions in context, alongside the rest of the process, in our step-by-step homeowner guide. The standards page explains how BS 7593 relates to commissioning under MIS 3005.

Compare the three cleaning methods

Sources

  1. F5BSI Knowledge, BS 7593 (opens in a new tab)
  2. F6ACR Journal on HHIC/HPA guidance (opens in a new tab)
  3. F7Registered Gas Engineer summary of BS 7593:2019 (opens in a new tab)
  4. F9HPA air source heat pump commissioning checklist (opens in a new tab)

Last reviewed: . Checked against the sources listed on this page; this is not an independent technical or professional review.

Before anything is connected

Ask how your existing system will be cleaned, before the heat pump goes in.